Project Overview: Eastham Complete Deck Build
The Challenge
This project started with a scattered backyard layout featuring two sliding doors at different levels and old brick steps. The homeowners needed a cohesive outdoor living space that would connect the house to the yard while providing modern amenities.
The Solution
- • Custom deck design and architectural plans
- • Building permit acquisition
- • New concrete footings and pressure-treated framing
- • TimberTech Slate Grey composite decking
- • TimberTech Trademark white composite railing
- • Built-in bench seating
- • Outdoor shower installation
- • Under-rail LED lighting system
Step 1: Planning & Design
Custom Design Vision
Working closely with the homeowners, we developed a comprehensive deck design that addressed their specific needs. The design incorporated multiple access points, integrated an outdoor shower area, and maximized the usable outdoor space.
Planning Phase Included:
- • Site measurement and assessment
- • Architectural drawings and plans
- • Building permit application
- • Material selection consultation
- • Timeline and budget planning
Step 1.5: Site Preparation & Permits
Preparing for Success
Before any construction begins, we handle all the necessary preparations including permit acquisition, utility location, and site clearing. This ensures a smooth construction process without delays.
Site Prep Work:
- • Building permit approval
- • Utility location and marking
- • Site access and staging setup
- • Removal of old structures
- • Material delivery coordination
Step 2: Excavation & Layout
Precise Excavation & Measurement
Using the approved plans, we precisely mark and excavate footing locations. Each hole is dug to the proper depth below the frost line, ensuring your deck will be stable through Cape Cod's freeze-thaw cycles.
Excavation Work:
- • Layout and string line setup
- • Footing hole excavation (42" deep minimum)
- • Soil inspection and compaction
- • Drainage and gravel base preparation
- • Inspection readiness check
Step 3: Foundation & Concrete
Solid Foundation for Lasting Quality
Every great deck starts with a solid foundation. We pour concrete footings and install post anchors, ensuring your deck will withstand Cape Cod's coastal weather for decades.
Foundation Work:
- • Concrete footings poured below frost line
- • Simpson Strong-Tie post anchors installed
- • Curing time and inspection
- • Pressure-treated post installation
- • Level and square verification
Step 4: Framing & Structure
Professional Framework Construction
With the foundation complete, we build the deck's structural framework using pressure-treated lumber and galvanized fasteners. Every connection is made with proper hardware for maximum strength and longevity.
Framing Components:
- • Pressure-treated beam installation
- • Joist layout and installation (16" O.C.)
- • Ledger board attachment to house
- • Joist hangers and galvanized fasteners
- • Blocking and lateral bracing
Step 5: Decking & Railings
Premium Materials, Expert Installation
We installed TimberTech Slate Grey composite decking boards for durability and low maintenance, paired with TimberTech Trademark white composite railings. The contrast creates a stunning visual appeal while providing years of worry-free enjoyment.
Materials & Features:
- • TimberTech Slate Grey composite decking
- • TimberTech Trademark white railings
- • Hidden fastener system
- • Custom built-in bench seating
- • Professional finishing touches
Step 6: Special Features & Lighting
The Finishing Touches That Make It Special
The final phase included installing an outdoor shower, under-rail LED lighting system, and other custom features that transform this from just a deck into a complete outdoor living experience.
Special Features Added:
- • Outdoor shower installation
- • Under-rail LED lighting system
- • Built-in bench seating
- • Custom storage solutions
- • Professional cleanup and final inspection
Step 7: Electrical & Plumbing Integration
Professional Systems Integration
Modern deck projects often require electrical and plumbing work. We coordinate with licensed professionals to ensure all systems are properly installed and up to code, including GFCI protection and proper drainage.
Systems Integration:
- • LED lighting system wiring
- • GFCI outlets and switches
- • Outdoor shower plumbing
- • Drainage and water management
- • Code compliance verification
Step 8: Final Inspection & Project Completion
Quality Assurance & Customer Satisfaction
Every project concludes with a thorough inspection, complete cleanup, and customer walkthrough. We ensure every detail meets our high standards and your expectations before considering the job complete.
Final Phase Includes:
- • Final building inspection approval
- • Complete site cleanup
- • Customer walkthrough and training
- • Warranty information and care instructions
- • Project documentation and photos
Complete Build Process Timeline
Planning & Design
Steps 1-1.5 (Days 1-7)
Design, permits, site prep
Foundation
Steps 2-4 (Days 8-10)
Excavation, concrete, framing
Construction
Steps 5-6 (Days 11-13)
Decking, railings, features
Completion
Steps 7-8 (Days 14-16)
Systems, inspection, final
*Timeline may vary based on weather, permit processing, and project complexity. We'll keep you informed throughout every step.
Before & After Transformation
Before: Scattered Layout
Disconnected sliding doors, old brick steps, no cohesive outdoor space
After: Stunning Outdoor Living
Unified design, composite materials, outdoor shower, lighting, built-in seating
Ready for Your Complete Deck Transformation?
Let us create a custom outdoor living space that exceeds your expectations. From initial design to final details, we handle every aspect of your deck project.